Bom Jardim operates an integrated on-site sequence: underground extraction, ore handling, processing and gold recovery, supported by site infrastructure. All operating figures are management-reported and approximate.

Process Flow

Integrated on-site sequence

  1. 01

    Underground extraction

    Development and stoping in underground workings.

  2. 02

    Ore handling

    Underground haulage, hoisting and surface stockpiling.

  3. 03

    Processing

    Crushing, milling and concentration at the on-site plant.

  4. 04

    Gold recovery

    Concentrate treatment and recovery of gold on site.

  5. 05

    Site infrastructure

    Power, water, workshops and support services.

Underground

Underground extraction

Extraction is carried out from developed underground workings. Management reports current extraction capability of approximately 30 tonnes per day. The active development program targets extended access, improved ventilation and increased mechanisation to open additional mining fronts and raise sustainable extraction rates.

Quartz vein exposed on an underground rock face
Quartz vein exposed on an underground working face.
Ore handling

Ore handling and movement

Material is moved from working faces through underground haulage to surface, where it is stockpiled and fed to the processing circuit. Handling capacity is being reviewed in parallel with mine development so that ore movement does not constrain future throughput.

Conveyors, stockpiles and plant structure — recent operating activity.
Processing

Processing plant

Ore is treated at the on-site processing facility. The plant carries a design target of approximately 300 tonnes per day; achieving sustained throughput at that level depends on corresponding mine development and consistent ore supply. Present throughput reflects current mine output rather than plant design capacity.

Hopper, crusher and conveyor feed — processing activity.
Recovery

Gold recovery

Gold is recovered on site from processed material. A recent reported operating campaign processed approximately 130 tonnes with approximately 3 kilograms of gold recovered. This figure is management-reported, relates to a single campaign, and should not be extrapolated into production rates, grades or annualised output.

Recovered gold bars from recent project operations
Recovered gold from recent project operations — management-supplied imagery. Not representative of future production or grade.
Infrastructure

Site infrastructure

The operating base includes power supply, water management, workshops, storage, and accommodation and support facilities for operating teams. Infrastructure upgrades are sequenced alongside underground development and plant works.

Site camp and support buildings surrounded by forest
Site camp and support infrastructure.

Operating Media

Bom Jardim Project Operations

Selected project media documenting underground activity, processing, site infrastructure and recent operations. Imagery of recovered gold documents operating activity and does not represent future production or grade.

Processing plant — mill and pump area.
Aerial view of the processing plant and covered shed
Processing plant and covered shed — aerial view.